Your building, with schedule, cost, and progress under control
Manage vertical construction floor by floor, without losing sight of the budget or the deadline.
Matterial is the operating system for your high-rise build: it brings the line-item budget, physical progress by floor, and actual spend together in one place. In a building, every floor repeats the same cycles —structure, masonry, MEP, and finishes— and Matterial lets you see how each one is tracking against the time and cost plan, so a delay or an overrun surfaces early instead of at handover.
The day-to-day of buildings / vertical today
In a building, everything stacks upward: a delay in one floor's structure pushes the MEP and finishes of every floor above it. When progress lives in a spreadsheet, the schedule in another file, and spend only in the site engineer's head, it's impossible to know in time whether you'll deliver on schedule and on budget. The overrun shows up once you're already ten floors up.
How Matterial helps
Start from the blueprint
Upload your drawings and the takeoff feeds the tower's budget and schedule, by line item and by floor.
Progress floor by floor
The crew logs the progress of structure, masonry, MEP, and finishes for each floor on site, with photos.
Compare plan vs. actual
You see each floor's physical progress and spend against the schedule and the budget, with alerts for delays and variances.
Report effortlessly
A weekly report with progress, photos, and cost reaches owners and investors on its own, without anyone building it by hand.
Key features for buildings / vertical
- Budget by line item and by floor of the building
- Tower schedule with critical path
- Physical progress by floor with photo evidence
- Actual cost control against budget
- Early alerts for delays and cost overruns
- Automatic weekly progress report
What changes
Features you'll use
Frequently asked questions
Does it work for multi-story buildings?
Yes. Matterial is built for vertical construction: you can track progress and cost floor by floor, and see how a delay on one floor affects the schedule of the ones above.
Can I control cost by floor of the building?
Yes. The budget is organized by line item, and you can see actual against budgeted spend all the way up the tower, with alerts when something drifts.
How do I manage the tower's schedule?
With a schedule that sequences the line items and shows the critical path, so you know which delay puts the building's handover date at risk.
Can investors see the progress?
Yes. Each week a report with progress, photos, and cost is generated and sent to owners and investors, without anyone having to put it together.
Get started with Matterial today
From blueprint to build, with clarity. Try it free, no card.