Your quantity takeoff, ready to price
Concrete, steel, masonry block, and finishes broken down from your blueprints, ready to price.
Matterial's quantity takeoff turns your blueprints into a structured breakdown of volumes and quantities —concrete, steel, masonry block, and finishes— organized by work section and line item. It's a clean, editable takeoff that becomes the direct starting point for your estimate, with no endless spreadsheet and no counting by hand.
| Material | Unit | Quantity |
|---|---|---|
| Concrete f'c=250 | m³ | 148.5 |
| Rebar | ton | 12.4 |
| Standard formwork | m² | 620 |
| Block wall | m² | 385 |
| Concrete slab-on-grade | m² | 210 |
What problem it solves
Traditional takeoff happens in a spreadsheet, line item by line item, and eats up entire days. A miscounted volume carries all the way through to the final price and eats into your margin; and since everyone quantifies their own way, comparing the takeoff across projects or across estimators is nearly impossible.
How it works
Starts from your blueprints
The takeoff builds on the volumes Matterial extracts from your blueprints in PDF or DWG, with scale and layers already recognized.
Structured by work section
Volumes are organized into a takeoff by work section and line item —concrete, steel, masonry block, finishes— with their units and quantities.
Review and adjust
You see the full breakdown and edit any quantity or line item before signing off. You have the final say.
Move to estimate
With the takeoff ready, you feed your estimate with line items, units, and quantities to put a price on them.
What's included
- Structured takeoff by work section and line item
- Volumes for concrete, steel, masonry block, and finishes
- Units and quantities ready to estimate
- An editable takeoff before it turns into cost
- A consistent basis for comparing projects and estimators
- A direct bridge to estimating and quotations
How to take off a project from the blueprint, in detail
What quantity takeoff really means (and what backup documentation is)
A takeoff translates the drawn project into measurable quantities: how much concrete, how much steel, how much block, how many square feet of finish. Those quantities are grouped by work section —general conditions, foundations, structure, masonry, finishes, MEP— and within each section by line item, the unit of work you later price and get paid for.
Behind every quantity there's backup: the breakdown that justifies where that volume came from —the beam run, the wall face, the floor area— piece by piece. On any serious project the backup isn't a luxury: it's what supports the baseline estimate and, later, every progress billing you send or approve. If the backup doesn't add up, the payment stalls.
Matterial's takeoff structures that work for you: it takes the volumes off the blueprint and organizes them into a takeoff by work section and line item, each with its unit and quantity. It's your backup, clean and editable —not a loose sheet only you understand.
- Work section: the chapter of the project (foundations, structure, masonry, finishes…)
- Line item: the unit of work within a section, with its unit of measure (CY, lb, SF, LF, EA)
- Backup: the breakdown that justifies where each quantity came from
- Takeoff: the full quantity breakdown, organized by work section and line item, ready to price
How to take off a project from a blueprint
The starting point is always the blueprint. Taking off by hand means opening the drawing, setting the scale, going layer by layer with a scale ruler or marking areas on the PDF, and dumping every measurement into a spreadsheet. It's days of work, and the costliest mistake isn't the visible one: it's the cubic yard counted over or under that nobody revisits until the job is already underway.
Matterial starts from the volumes it extracts from your blueprints in PDF or DWG, with scale and layers already recognized. On that base it builds the takeoff: the volumes of concrete, steel, masonry block, and finishes come organized by work section and line item, each with its unit and quantity. You don't key it in from scratch; you review.
And reviewing is the part that matters. You have the final say: you see the full breakdown, correct the quantity that doesn't match your firm's standards, adjust a line item, and sign off on what you're going to price. The machine does the tedious counting; the construction judgment is yours.
- Starts from your blueprints in PDF or DWG, with scale and layers already recognized
- Volumes broken down by work section and line item, not one global number with no backup
- Every quantity is editable before you sign off
- The same takeoff method repeats job after job, so you compare apples to apples
From quantity to unit price: why the count decides the margin
A quantity on its own isn't money; it becomes money when you attach a unit price. And a line item's unit price is built from three things: materials, labor, and —depending on the item— tools and equipment. Labor is figured from the crew that performs the item and its production rate —how much that crew installs per day— whether you pay by the day (day rate) or by the unit installed (piece rate).
That's why the accuracy of the takeoff hits the margin directly. If the concrete volume comes in inflated, you inflate material, mix, and the crew days that place it; if it comes in short, your bid loses against reality and you eat the overrun. The unit price amplifies any quantity error as many times as there are line items depending on that volume.
In Matterial the takeoff doesn't end at the number: it's the base your estimate builds on. Each line item moves to the estimator with its unit and quantity, where you assign the unit price —by hand or from your saved prices— and the amount calculates itself. You count once, right, and that count feeds everything downstream.
- Unit price = materials + labor (+ tools and equipment)
- Crew and production rate define how much labor each line item takes
- Day rate (paid by the day) or piece rate (the unit installed): two ways to cost the same quantity
- A quantity error multiplies across every line item that depends on it
The takeoff as a living baseline: from estimate to progress
The backup isn't used only once. The same breakdown that supports the baseline estimate is the yardstick you later measure progress against. On site there are two kinds of progress: physical —how much of each line item is installed, in its unit— and financial —how much of that has been billed or paid. Both are read against the taken-off quantities: without clear backup, you don't know whether the 60% the field reports is 60% of the work or 60% of the money.
When the takeoff stays tied to the blueprint, a design change doesn't force you to redo everything by hand: you adjust where it changed and the breakdown stays consistent. That traceability —from blueprint to line item to quantity— is what lets you defend a progress billing to the owner or inspector without endless arguments.
That's why Matterial's takeoff is the starting point, not an island: it moves to the estimate, and from there the job continues to quotations, schedule, purchasing, and cost control with the same origin quantity. One set of backup, consistent from bid to closeout.
- Physical progress: how much of each line item is installed, in its unit
- Financial progress: how much of that has already been billed or paid
- Both are measured against the backup quantities
- One origin quantity, consistent from estimate to cost control
Takeoff in spreadsheets vs. with Matterial
How the work of taking off a project changes when you leave the spreadsheet and the photos-by-text behind.
| Today (spreadsheets and phone photos) | With Matterial | |
|---|---|---|
| Starting point | Measure the blueprint by hand with a scale ruler or by marking up the PDF | Volumes extracted from the blueprint in PDF or DWG |
| Takeoff time | Days per project, line item by line item | The breakdown arrives assembled; you review and adjust |
| Organization | Everyone with their own template and their own rules | Structured takeoff by work section and line item, the same on every job |
| Quantity errors | A miscounted figure carries through and nobody notices | You review the full breakdown before signing off |
| Backup documentation | Loose sheets only the person who made them understands | Clean, editable backup tied to the blueprint |
| Handoff to estimate | Re-keying line items and quantities | They move straight to the estimate with unit and quantity |
| A design change | Redo the affected sheets by hand | You adjust where it changed and the breakdown stays consistent |
| Comparing across projects | Nearly impossible: every file is different | A consistent basis for comparing projects and estimators |
An example takeoff (illustrative)
A hypothetical single-family home to show what a summarized takeoff by work section looks like. The volumes and the total are made up to illustrate the format of the breakdown; they aren't market prices or a figure from your project.
Hypothetical figures, only to explain the format of the breakdown. The total depends on the unit prices you assign in the estimate; Matterial doesn't set market prices.
Use cases
An invitation to bid comes in with PDF plans. Instead of losing three days measuring by hand, they start from the structured takeoff, adjust the line items to the firm's standards, and enter the estimate with quantities already backed up.
The owner sends their own takeoff in a spreadsheet. They check it against Matterial's breakdown by work section and line item to catch inflated or missing volumes before signing —not after the job is already underway.
They need to put together the monthly progress billing. They lean on the line-item backup to report physical progress against the taken-off quantities and defend each volume to the owner's rep without arguments.
Before ordering the concrete for the slab, they check the taken-off volume for that line item so they don't over-order or come up short mid-pour, keeping waste in line with what the blueprint actually calls for.
Who it's for
Works with the rest of Matterial
Guides to go deeper
Related terms
Frequently asked questions
What is quantity takeoff in Matterial?
It's a structured breakdown of the volumes and quantities in your project —concrete, steel, masonry block, and finishes— organized by work section and line item, ready to price in your estimate.
How do you take off a project from a blueprint?
You start from the blueprint: set the scale, identify the elements by layer, and measure lengths, areas, and volumes, then group them by work section and line item. In Matterial that count starts from the volumes extracted from your PDF or DWG; you review and adjust the breakdown instead of measuring every line by hand.
What is takeoff backup documentation?
It's the breakdown that justifies where each quantity came from —run by run, face by face. It supports the baseline estimate and every progress billing. Matterial's takeoff, structured by work section and line item, works as that backup —clean and editable.
Where do the takeoff quantities come from?
They come from the volumes Matterial extracts from your blueprints in PDF or DWG. The takeoff structures those volumes by work section so you can move straight to estimating.
What work sections and materials can it take off?
It works on the volumes of concrete, steel, masonry block, and finishes extracted from the blueprint, organized by work section and line item, each with its unit and quantity.
Can I edit the takeoff before estimating?
Yes. The entire takeoff is editable: you can correct quantities, units, and line items before turning it into an estimate.
Is it construction takeoff software?
Yes. Matterial takes off from the blueprint and delivers a structured takeoff by work section and line item, editable and ready to price, instead of a spreadsheet built by hand.
Does it help prepare bids?
Yes. By starting from the bid drawings you get quantities by work section and line item with their backup, and move straight to the estimate to build your proposal.
What comes after the takeoff?
The takeoff feeds your estimate with line items, units, and quantities, and from there you can move on to quotations, purchasing, and the schedule.
Get started today with Matterial
From blueprint to build, with clarity. Try it free, no card.